NOTICE TO CONTRACTORS

Notice is hereby given that the Sevier School District, 180 East 600 North, Richfield, Utah, will receive sealed Bid Proposals on or before Tuesday, March 27, 2018 at 2:00 p.m. for the construction of the following:


North Sevier High School Classroom Mechanical Upgrade


These Contract Documents may be examined and copies obtained on or after Tuesday, March 13th, 2018 at noon at the office of KMA Architects Inc., 195 East 100 North, Provo, Utah. A deposit of $250.00 per set will be required. Such deposits shall be made payable to the Architect and will be refunded upon the return of such copies in good condition within ten (10) calendar days after the bids are opened, otherwise, deposit will be forfeited.

An electronic copy of the contract documents will be available upon request.


North Sevier High School Project consists of the following:

This project includes the demolition of the existing mechanical system over the classroom area on the east side of the building. There is to be a new mechanical unit to be installed in the existing attic space. The electrical is to be upgraded for the new system. There is to be a new mezzanine floor with stairs to be installed for the new mechanical unit. There will be new return air chases installed in the classrooms and other miscellaneous rooms throughout the project.


There are two alternates with this project:


Alternate #1 – New mechanical chiller and compound

There is to be a new mechanical chiller and compound attached to the project along with the associated equipment. The compound is to be located on the north side of the building. It will contain concrete pad and chain link fence.


Alternate #2 – Wood shop mechanical upgrade

The existing mechanical system at the wood shop is to upgrade with a new mechanical unit located in the mezzanine above the shop. The existing fan coils are to be removed with new duct attached to the new unit. The existing ductwork and diffusers in the room are to remain.


Documents may also be examined at the following locations:


Mountainlands Area Plan Room

1116 S. State St.

Orem, UT 84097

(801) 288-1188


Mountainlands Area Plan Room

583 West 3650 South, Suite 4

Salt Lake City, UT 84115

(801) 226-0946


Construction Documents and Scope Sheets (proposal form) must be used for bidding this project and will be provided by KMA Architects.

The Board reserves the right to accept any or reject any or all proposals, or waive any informality in a proposal.